Site Formation and Infrastructure Works
at Three Urban Squatter Areas, Kowloon East

Project Details

The project includes site formation and infrastructure works for public housing development

Anticipated Completion Date
2000 Year

Cha Kwo Ling Village

Commencement Date of the Work:July 2023
Around 0 Year
Anticipated Completion Date
2000 Year

Ngau Chi Wan Village

Commencement Date of the Work:June 2025
Around 0 Year
Anticipated Completion Date
2000 Year

Chuk Yuen United Village

Commencement Date of the Work:August 2023
Around 0 Year

Background for the Project

It was announced in the 2019 Policy Address that the Government would redevelop three urban squatter areas (i.e. Cha Kwo Ling Village, Ngau Chi Wan Village and Chuk Yuen United Village), so as to increase public housing supply in the urban areas through high-density development and improve the living environment of residents in the squatter areas through the Government’s compensation and rehousing arrangements. The Government would take up the site formation and infrastructure works, then deliver the sites to the Hong Kong Housing Society for construction of a total of about 8 000 public housing units.

The scope of the works mainly comprises the site formation and infrastructures works for public housing developments at the three urban squatter areas in Kowloon East:

a)site clearance and formation, as well as construction of related retaining walls and slopes;
b)construction of two carriageways with associated footpaths to connect (i) Ko Ling Road and Cha Kwo Ling Road, and (ii) Cha Kwo Ling Road and Fan Wa Street;
c)construction of a new pedestrian link to connect the new link road mentioned in item (i) above to the public housing development at Cha Kwo Ling Village;
d)associated road improvement works near the three squatter areas; and
e)associated ancillary works including drainage works, sewerage works, waterworks, land decontamination works and roadside greening works.

Work Scope

The project will include site formation and infrastructure works for the development of public housing

Site plan of site formation and infrastructure works for public housing development at Cha Kwo Ling Village, Kowloon East

Site plan of infrastructure works for public housing development at Chuk Yuen United Village, Wong Tai Sin

Site plan of site formation and infrastructure works for public housing development at Ngau Chi Wan Village, Wong Tai Sin

Site Formation and Infrastructure Works for the Development of ex­-Cha Kwo Ling Kaolin Mine Site (Phase 2)
(Contract No. SD/2022/02)
Site Formation and Infrastructure Works at Three Urban Squatter Areas, Kowloon East
(Contract No. SD/2024/02)